Thursday 31 July 2008

My workplace


Lockheed L1011 for D Check


I'm now on this one fixing up the cargo bay. The cargo floor boards are sealed not like B767...

Kampong Boy.


The boys from Kg Saba.

boat wreck

kapal pacah @sungai basar

Wednesday 30 July 2008

Greatest Pleasure.


Nothing excites us to see a serviceable aircraft departing the hangar after a major checks. This is Bravo Golf after the partial pylon mod which clocked us more than 200 hrs of OT. Everyone in the pylon section ended up smiling after seeing their pay-slip.

Sunday 27 July 2008

Bravo-Golf.


Gold mine when she was docked in the hangar.

Fireworks



Billy..... nunggu lagi pai tahun dapan...queue panjang for the Mark III....deposit plang udah :)

Fireworks at Bandar.


Lots of noise, camera suffered from high noise and hot pixels, i think its about time for a replacement after all its only been 5 years. Batah jua Mark III ku ani kan sampai ehh (Gary MD n Jumroots, yours bila datang.. my payment settled yesterday already).

Friday 25 July 2008

In motion

The Bible, Aircraft Maintenance Manual.




Read the manual , and you will be awrite.

The Metal-Men Freestyle.

Main Fuel Filter Change.


Funny how the airbus design the system, instead of pulling the CB open, the manual is telling us to close it instead totally the opposite of the Boeing type. Another B1 Engineer carrying out the filter change on the V2500 recently.

Wednesday 23 July 2008

The Inlet Cone Polyurethane Inspection.


On every C-Check, part of the routine inspection is to carry out the inlet cone inspection for missing layer of polyurethane coating or exposing of the parent material. Here is a picture of a B1 Engineer carrying out the mentioned task. Method of inspection requires visual and physical.

Tuesday 22 July 2008