Wednesday, 15 October 2008

STRIPPED......till bare naked......


bekilat bahhhhhhhhhh macam kepala........abis nya becukur hehehehehe. siapa tu nah??????

Monday, 6 October 2008

B757 C Check


On the first day of Hari Raya I got to work on this B757 which was also in the final days of its C Check. Apparently its being leased by the Saudi Royals for a few months and later it'll be leased by FedEx. All i got to do was reinstall all 20 slat drive actuators.

Sunday, 28 September 2008

KABO Air

Been busy with final stages of the D check. The gear retraction and alternate extension went ok.






































Sunday, 21 September 2008

Second D Check


The second D Check Aircraft

Tuesday, 26 August 2008

Power plant...powerful engines indeed

A friend of mine send me this image of a GE engine whose turbine disc broke off during an engine run and got lodged into another aircraft's engine core cowl.Lucky it didn't happen in flight and no one was hurt.

Sunday, 24 August 2008

The Proof.


Controller Phil Chin inspecting the damaged scrapper seal on the Bravo Tango NLG Oleo.

Friday, 22 August 2008

Nose Gear Installation Job



Today we installed the nose gear on this B747 and it took only 2 guys to complete the installation in 8 hrs.


















The nose wheel is still hanging in the air. It'll only touch the ground when when the aircraft is off the main jacks.


















Me and my Nigerian "Coleman the Jackass" buddy who did the installation.















Next job is this wing main gear....i wonder how long will this take as there is 4 of the to be done.

Wednesday, 20 August 2008

The Elite Team.



The Elite Team. Nose scrapper ring change, just let them know.

Thursday, 14 August 2008

B747 Nose Gear Swap

Took me and a team of 3 people 5days to swap nose gear assy.






































































Monday, 11 August 2008

The gold mine task...


Changing the Scrapper and Dynamic seal on the Oleo of A320 was rather a challenging but yet enjoyable task, especially doing it during the weekend. If you ever wonder why it as grounded, this picture will give you enough explanation.

Air Ground System changeover.


Paree...make sure you configure the Aircraft to flight mode before jacking procedure c/out, or else, this will happen...

Saturday, 9 August 2008

I'm watching you, KiD....




C/out leak check post EGR, Leak chk c/out Satis.